Watch a Centre of Excellence actually work.
A modern CoE is not a team of experts and a slide of principles. It is a system: a front door, rules for what gets built, agents doing the routine work, gates that scale with risk, a library of reusable assets and a way to prove value. Follow one idea from a plant floor in Osaka to every region, and open every document it creates on the way.
Halden Group, its people, ideas and numbers are fictional. The structure, procedures and controls are how I would set up a CoE for real, for any mandate: AI, automation, data, process or cloud.
This quarter's pipeline
Latest activity
- Day 96PunePune champion started localisation checklist for Seal Watch
- Day 95HubSOP-04 updated to version 2.1 after the Seal Watch retrospective
- Day 94StuttgartStuttgart submitted IDEA-0153: invoice exception triage
- Day 93HoustonHouston reused the shift handover summariser asset (reuse no. 41)
- Day 92HubMonthly CoE report published to the steering group
- Day 90SheffieldSheffield paused IDEA-0139: data owner not yet named
Involved at this step
Twelve building blocks make up the system. Each one shows what it contains, where it appeared in the Osaka story, and its working document.
Every document the system produced for one idea, plus the standing documents that run the CoE. Click any one to open it.
SOP library
| SOP | Procedure | Owner | Service level |
|---|---|---|---|
| SOP-01 | Idea intake | Submitter | 2 working days to acknowledge |
| SOP-02 | Value and effort scoring | Value analyst | Within 5 working days of triage |
| SOP-03 | Portfolio decision | CoE lead | Monthly board |
| SOP-04 | Reuse and duplicate check · | Regional champion | 2 working days |
| SOP-05 | Build standard | Lead engineer | Every sprint |
| SOP-06 | Risk gate | Governance lead | 5 working days |
| SOP-07 | Pilot and measure | Business owner | Agreed per pilot |
| SOP-08 | Asset harvest | Lead engineer | Within 4 weeks of pilot close |
| SOP-09 | Scale and localise | Regional champion | Per wave plan |
| SOP-10 | Benefits and retrospective | Value analyst | Monthly and at each stage close |
Agents do the routine work of the CoE. Each has one job, a list of things it may never do, and a named human who approves its output.
Intake agent
Translates submissions into English, fills missing fields by asking the submitter, and tags the business area.
Never: rejects an idea. Only a human can close one.
Approved by: Regional champion
Triage and reuse agent
Searches every idea ever submitted, including paused ones, and the asset library for overlaps. Proposes a risk tier.
Never: merges ideas or sets the final risk tier.
Approved by: Champion, then governance lead
Documentation agent
Drafts model cards, runbooks and asset cards from the build repository and test results.
Never: publishes. A named engineer signs each document.
Approved by: Lead engineer
Evaluation agent
Runs the test suite on every change, including per-language accuracy and drift checks, and reports failures.
Never: lowers a threshold or marks a failed test as passed.
Approved by: Governance lead
Value tracking agent
Pulls downtime and usage data each week, updates the benefits register and flags assets nobody is using.
Never: reports a benefit the business owner has not confirmed.
Approved by: Value analyst and business owner
Tool-agnostic architecture
Twelve questions, one per block. Answer for your own CoE, or the one you are about to build. Nothing leaves your browser.